Short answer: Use a 30-day pilot to establish a baseline, test one bounded workflow, run it with human oversight and make an explicit go/no-go decision. The schedule is a planning template, not a promise that every integration can launch in a month. Access delays, missing data and unresolved business rules can change the timeline.
The best first pilot is small enough to stop safely and important enough that someone will care about the result. “Transform the business with AI” fails both tests.
Choose the smallest complete outcome
Pick a workflow with a clear input, completed outcome and accountable owner. Examples include routing a qualified enquiry, preparing a quotation comparison or producing a checked weekly report. Avoid a first pilot whose success depends on replacing several core systems simultaneously.
Write a one-sentence hypothesis: “For these eligible requests, this process should reduce active handling time while maintaining the agreed quality checks.” Specify what is excluded. A review-only tool should not quietly become an autonomous sender or purchasing authority during the pilot.
What productivity research can and cannot tell you
A field experiment reported in Shifting Work Patterns with Generative AI involved 66 firms and 7,137 knowledge workers. In the later part of the experiment, treated workers who used the tool spent about two fewer hours on email weekly; the paper did not find corresponding shifts in the quantity or composition of tasks from individual-level provision. The paper's disclosures include Microsoft-affiliated authors. This is evidence about a specific setting, not a forecast for your business. NBER working paper
METR's early-2025 experiment with 16 experienced open-source developers and 246 tasks found that access to the studied AI tools made completion take 19% longer. Its February 2026 follow-up explains why selection and measurement issues make later estimates unreliable as a precise current speedup measure. Read both before using the earlier result as a universal verdict. Original study · 2026 update
The useful conclusion is methodological: measure the complete task in your own setting, including checking and rework. Neither a positive average nor a negative result elsewhere removes that need.
A four-week delivery plan
Full breakdown
| Phase | Work to complete | Gate before continuing |
|---|---|---|
| Days 1–5: baseline | Observe comparable cases, map steps, name owners and measure active time | The expected outcome and current workload are agreed |
| Days 6–12: design and test | Confirm supported access, build the bounded flow and test difficult cases | Permissions, duplicate handling and failure recovery work |
| Days 13–21: supervised operation | Run in shadow or review mode and record corrections | Quality and review effort are acceptable on representative work |
| Days 22–30: decision | Reconcile outcomes, calculate net effort and document handover | Expand, revise or stop based on written evidence |
Dates are illustrative. If the system cannot safely reach the necessary records by day 6, change the plan rather than pretending implementation is underway. If volume is low, extend the observation period instead of drawing a confident conclusion from three cases.
Your 30-day pilot
Planning template
- BaselineDays 1–5
- Build & testDays 6–12
- PilotDays 13–21
- DecideDays 22–30
Details
Proposed schedule, not a guaranteed delivery date. Access, data and unresolved rules can change the plan.
- Baseline: Measure the current process and agree on the outcome.
- Build & test: Confirm access and test normal and difficult cases.
- Pilot: Run with oversight and record corrections.
- Decide: Compare results. Expand, revise or stop.
Exceptions: Pause when evidence or access is missing. Allow longer observation for low-volume work.
Define success before seeing the result
Choose one primary efficiency measure, one quality measure and one operational reliability measure. For enquiry routing, these might be staff minutes per correctly assigned enquiry, assignment correctness and unresolved failures. Keep elapsed customer waiting time separate from active staff time.
Set an acceptance threshold with the business owner. “No unauthorised sends” is a blocker, not a percentage that a time-saving average can compensate for. Require a named person to own exceptions after the pilot; the implementation team's temporary attention is not a permanent operating model.
A worked pilot decision
Assume 100 comparable monthly requests take 12 active minutes each: 20 hours. The proposed process uses five minutes per request for review and completion, plus two hours for exceptions and maintenance: about 10.3 hours. Under these fictional assumptions, 9.7 hours are released.
If the pilot also reveals correction work of another six hours, the benefit falls to 3.7 hours. Whether that justifies actual setup and recurring costs is a separate decision. These are illustrative calculations, not promised Formula Works savings. Use the ROI planning tool for a quick conversation starter and the measurement guide for evidence.
Make stopping an acceptable result
A pilot can end with “keep the reminder automation, remove the AI classification” or “fix the source data first.” Write down what was learned, preserve the useful documentation and revoke access that is no longer needed. Continuing solely because a demo looked impressive turns discovery into an open-ended expense.
Is 30 days enough to prove ROI?
It can establish an initial workload comparison, but not every seasonal effect, long-term support cost or revenue outcome. State the period and sample alongside the result.
What should Formula Works deliver at the end?
The agreed scope should identify the working flow, evaluation evidence, unresolved issues, operating instructions and support arrangements. Do not assume those items are included without a written agreement.
Download the four-week pilot decision sheet. Read the proposal comparison, explore workflow automation or start a scoped discussion.